  • 1.  Successful Go-Live at USQ

    Posted 10-01-2009 06:57 PM
    Colleagues

    On Monday 28 September 2009 USQ successfully went live with Project S which encompassed the following upgrades and new implementations.

    PeopleSoft Student 7.6 to Campus Solutions V9.0
    PeopleSoft HR/Payroll 7.6 to HR/Global Payroll V9.0
    Oracle Portal
    Oracle Identity Management (effectively live since March 2009)
    Sitecore CMS (live since mid August)
    Gmail for Students
    New Modular Data Centre

    The upgrades and implementations were not without their challenges and there is still some minor mopping up in progress but all in all a major project delivered ontime and within budget which is a credit to all those involved. We could not have achieved this without the commitment of all staff, management and contractors involved and having adequate resources and skillsets available.

    In many respects we were once again let down by our suppliers on many fronts and we will cover off a number of the issues we encountered as future learning's at the November HEUG.

    Good luck to those still in the throws of PeopleSoft upgrades and implementations as we have heard a number are facing challenges of their own.

    Kind regards

    Brian Kissell
    Chief Technology Officer


    This email (including any attached files) is confidential and is for the
    intended recipient(s) only. If you received this email by mistake,
    please, as a courtesy, tell the sender, then delete this email.

    The views and opinions are the originator's and do not necessarily
    reflect those of the University of Southern Queensland. Although all
    reasonable precautions were taken to ensure that this email contained no
    viruses at the time it was sent we accept no liability for any losses
    arising from its receipt.

    The University of Southern Queensland is a registered provider of
    education with the Australian Government (CRICOS Institution Code No's.
    QLD 00244B / NSW 02225M)


    Attend a Regional Conference Near You!


  • 2.  Successful Go-Live at USQ

    Posted 10-01-2009 07:00 PM
    Brian



    Congratulations to everyone involved at USQ!! What an effort.



    Cheers, Mark



    Mark Erickson
    Deputy Registrar, Student Administration & Systems
    Registrar and Student Services
    Pauline Griffin Building, Bldg No. 11
    The Australian National University
    CANBERRA ACT 0200 AUSTRALIA

    P: +61 2 6125 0438
    F: +61 2 6125 8421
    W: www.anu.edu.au
    ANU CRICOS # 00120C



    ________________________________

    From: Brian Kissell [mailto:Brian.Kissell@usq.edu.au]
    Sent: Friday, 2 October 2009 8:57 AM
    To: 'anz.heug@list.heug.org'
    Subject: [anz.heug] - Successful Go-Live at USQ



    Colleagues



    On Monday 28 September 2009 USQ successfully went live with Project S
    which encompassed the following upgrades and new implementations.



    PeopleSoft Student 7.6 to Campus Solutions V9.0

    PeopleSoft HR/Payroll 7.6 to HR/Global Payroll V9.0

    Oracle Portal

    Oracle Identity Management (effectively live since March 2009)

    Sitecore CMS (live since mid August)

    Gmail for Students

    New Modular Data Centre



    The upgrades and implementations were not without their challenges and
    there is still some minor mopping up in progress but all in all a major
    project delivered ontime and within budget which is a credit to all
    those involved. We could not have achieved this without the commitment
    of all staff, management and contractors involved and having adequate
    resources and skillsets available.



    In many respects we were once again let down by our suppliers on many
    fronts and we will cover off a number of the issues we encountered as
    future learning's at the November HEUG.



    Good luck to those still in the throws of PeopleSoft upgrades and
    implementations as we have heard a number are facing challenges of their
    own.



    Kind regards



    Brian Kissell

    Chief Technology Officer



    -----End Original Message-----

    Attend a Regional Conference Near You!


  • 3.  Successful Go-Live at USQ

    Posted 10-01-2009 07:03 PM
    Dear Brian,

    Congratulations to a job well done by the sounds of things!!

    If we at Griffith can provide any assistance in terms of benchmarking or
    just to discuss processes and systems, please let me know.

    Cheers

    Shane

    Shane Pitman
    Manager, Human Resource Services
    Office of Human Resource Management
    GRIFFITH UNIVERSITY
    170 Kessels Road, Nathan QLD 4111

    Telephone: (07) 3735 7872
    Facsimile: (07) 3735 7065
    Mobile: 0434 602 906



    From:
    "Brian Kissell" <Brian.Kissell@usq.edu.au>
    To:
    "'anz.heug@list.heug.org'" <anz.heug@list.heug.org>
    Date:
    02/10/2009 09:01 AM
    Subject:
    [anz.heug] - Successful Go-Live at USQ



    Colleagues

    On Monday 28 September 2009 USQ successfully went live with Project S
    which encompassed the following upgrades and new implementations.

    PeopleSoft Student 7.6 to Campus Solutions V9.0
    PeopleSoft HR/Payroll 7.6 to HR/Global Payroll V9.0
    Oracle Portal
    Oracle Identity Management (effectively live since March 2009)
    Sitecore CMS (live since mid August)
    Gmail for Students
    New Modular Data Centre

    The upgrades and implementations were not without their challenges and
    there is still some minor mopping up in progress but all in all a major
    project delivered ontime and within budget which is a credit to all those
    involved. We could not have achieved this without the commitment of all
    staff, management and contractors involved and having adequate resources
    and skillsets available.

    In many respects we were once again let down by our suppliers on many
    fronts and we will cover off a number of the issues we encountered as
    future learning’s at the November HEUG.

    Good luck to those still in the throws of PeopleSoft upgrades and
    implementations as we have heard a number are facing challenges of their
    own.

    Kind regards

    Brian Kissell
    Chief Technology Officer

    This email (including any attached files) is confidential and is for the
    intended recipient(s) only. If you received this email by mistake, please,
    as a courtesy, tell the sender, then delete this email.

    The views and opinions are the originator's and do not necessarily reflect
    those of the University of Southern Queensland. Although all reasonable
    precautions were taken to ensure that this email contained no viruses at
    the time it was sent we accept no liability for any losses arising from
    its receipt.

    The University of Southern Queensland is a registered provider of
    education with the Australian Government (CRICOS Institution Code No's.
    QLD 00244B / NSW 02225M) -----End Original Message-----


    Attend a Regional Conference Near You!


  • 4.  Successful Go-Live at USQ

    Posted 10-01-2009 07:06 PM
    Hi Brian

    Congratulations to you and your team. We still have 10 months of challenges ahead of us! Are you going to Oracle Open world?

    Cheers Ron

    From: Brian Kissell [mailto:Brian.Kissell@usq.edu.au]
    Sent: Friday, 2 October 2009 11:57 a.m.
    To: 'anz.heug@list.heug.org'
    Subject: [anz.heug] - Successful Go-Live at USQ

    Colleagues

    On Monday 28 September 2009 USQ successfully went live with Project S which encompassed the following upgrades and new implementations.

    PeopleSoft Student 7.6 to Campus Solutions V9.0
    PeopleSoft HR/Payroll 7.6 to HR/Global Payroll V9.0
    Oracle Portal
    Oracle Identity Management (effectively live since March 2009)
    Sitecore CMS (live since mid August)
    Gmail for Students
    New Modular Data Centre

    The upgrades and implementations were not without their challenges and there is still some minor mopping up in progress but all in all a major project delivered ontime and within budget which is a credit to all those involved. We could not have achieved this without the commitment of all staff, management and contractors involved and having adequate resources and skillsets available.

    In many respects we were once again let down by our suppliers on many fronts and we will cover off a number of the issues we encountered as future learning's at the November HEUG.

    Good luck to those still in the throws of PeopleSoft upgrades and implementations as we have heard a number are facing challenges of their own.

    Kind regards

    Brian Kissell
    Chief Technology Officer

    -----End Original Message-----
    Attend a Regional Conference Near You!


  • 5.  Successful Go-Live at USQ

    Posted 10-01-2009 07:09 PM
    mObgn


    Attend a Regional Conference Near You!


  • 6.  Successful Go-Live at USQ

    Posted 10-01-2009 07:13 PM
    Brian,



    Congratulations to all at USQ on the successful implementation of a
    mammoth undertaking.



    Best wishes........Rick.





    --

    Rick Van Haeften

    Director, Information Services

    The Australian National University

    Building 15, Room 3.14, Chifley Library

    Canberra ACT 0200 Australia

    T: +61 2 6125 5454

    F: +61 2 6125 0449

    E: rick.vanhaeften@anu.edu.au <mailto:rick.vanhaeften@anu.edu.au>

    www.anu.edu.au <http://www.anu.edu.au>

    CRICOS Provider #00120C







    From: Brian Kissell [mailto:Brian.Kissell@usq.edu.au]
    Sent: Friday, 2 October 2009 8:57 AM
    To: 'anz.heug@list.heug.org'
    Subject: [anz.heug] - Successful Go-Live at USQ



    Colleagues



    On Monday 28 September 2009 USQ successfully went live with Project S
    which encompassed the following upgrades and new implementations.



    PeopleSoft Student 7.6 to Campus Solutions V9.0

    PeopleSoft HR/Payroll 7.6 to HR/Global Payroll V9.0

    Oracle Portal

    Oracle Identity Management (effectively live since March 2009)

    Sitecore CMS (live since mid August)

    Gmail for Students

    New Modular Data Centre



    The upgrades and implementations were not without their challenges and
    there is still some minor mopping up in progress but all in all a major
    project delivered ontime and within budget which is a credit to all
    those involved. We could not have achieved this without the commitment
    of all staff, management and contractors involved and having adequate
    resources and skillsets available.



    In many respects we were once again let down by our suppliers on many
    fronts and we will cover off a number of the issues we encountered as
    future learning's at the November HEUG.



    Good luck to those still in the throws of PeopleSoft upgrades and
    implementations as we have heard a number are facing challenges of their
    own.



    Kind regards



    Brian Kissell

    Chief Technology Officer



    -----End Original Message-----

    Attend a Regional Conference Near You!


  • 7.  Successful Go-Live at USQ

    Posted 10-01-2009 07:17 PM
    Congratulations - a real achievement..

    From: Brian Kissell [mailto:Brian.Kissell@usq.edu.au]
    Sent: Friday, 2 October 2009 11:57 a.m.
    To: anz.heug@list.heug.org
    Subject: [anz.heug] - Successful Go-Live at USQ

    Colleagues

    On Monday 28 September 2009 USQ successfully went live with Project S which encompassed the following upgrades and new implementations.

    PeopleSoft Student 7.6 to Campus Solutions V9.0
    PeopleSoft HR/Payroll 7.6 to HR/Global Payroll V9.0
    Oracle Portal
    Oracle Identity Management (effectively live since March 2009)
    Sitecore CMS (live since mid August)
    Gmail for Students
    New Modular Data Centre

    The upgrades and implementations were not without their challenges and there is still some minor mopping up in progress but all in all a major project delivered ontime and within budget which is a credit to all those involved. We could not have achieved this without the commitment of all staff, management and contractors involved and having adequate resources and skillsets available.

    In many respects we were once again let down by our suppliers on many fronts and we will cover off a number of the issues we encountered as future learning's at the November HEUG.

    Good luck to those still in the throws of PeopleSoft upgrades and implementations as we have heard a number are facing challenges of their own.

    Kind regards

    Brian Kissell
    Chief Technology Officer

    -----End Original Message-----
    "The contents of this e-mail (including any attachments) may be confidential and/or subject to copyright. Any unauthorised use,
    distribution, or copying of the contents is expressly prohibited. If you have received this e-mail in error, please advise the sender
    by return e-mail or telephone and then delete this e-mail together with all attachments from your system."
    Attend a Regional Conference Near You!


  • 8.  Successful Go-Live at USQ

    Posted 10-01-2009 07:38 PM
    Congratulations to you and the team Brian.


    regards
    Jason

    Jason Dolan
    Project Manager
    Enabling Systems Projects - Student Placement System
    Information Strategy and Technology Services
    University of South Australia
    A2-05, A Building
    Mawson Lakes Campus
    Mawson Lakes SA 5095

    Ph: +61 8 8302 6330
    Mob: +61 434 601 092

    Em: jason.dolan@unisa.edu.au<mailto:jason.dolan@unisa.edu.au>

    CRICOS Provider Number 00121B

    From: Brian Kissell [mailto:Brian.Kissell@usq.edu.au]
    Sent: Friday, 2 October 2009 8:27 AM
    To: 'anz.heug@list.heug.org'
    Subject: [anz.heug] - Successful Go-Live at USQ

    Colleagues

    On Monday 28 September 2009 USQ successfully went live with Project S which encompassed the following upgrades and new implementations.

    PeopleSoft Student 7.6 to Campus Solutions V9.0
    PeopleSoft HR/Payroll 7.6 to HR/Global Payroll V9.0
    Oracle Portal
    Oracle Identity Management (effectively live since March 2009)
    Sitecore CMS (live since mid August)
    Gmail for Students
    New Modular Data Centre

    The upgrades and implementations were not without their challenges and there is still some minor mopping up in progress but all in all a major project delivered ontime and within budget which is a credit to all those involved. We could not have achieved this without the commitment of all staff, management and contractors involved and having adequate resources and skillsets available.

    In many respects we were once again let down by our suppliers on many fronts and we will cover off a number of the issues we encountered as future learning's at the November HEUG.

    Good luck to those still in the throws of PeopleSoft upgrades and implementations as we have heard a number are facing challenges of their own.

    Kind regards

    Brian Kissell
    Chief Technology Officer

    -----End Original Message-----
    Attend a Regional Conference Near You!


  • 9.  Successful Go-Live at USQ

    Posted 10-01-2009 08:00 PM
    Congratulations, Brian and all of the team at USQ. TAFE Queensland shuts
    down it's student admin system next Thursday to upgrade to CS9.0 with an
    expected go live on Monday 19th October. We also look forward to sharing
    our experiences in November.

    Cheers,

    Debbie


    Debbie Kerswill | Project Manager
    ISAS Upgrade Project
    Information Technology Services
    Phone: 07 3900 2001 | Fax: 07 3900 2098 | Mobile: 0400 738 332

    Visit DETA Employee Portal>Portal Quick Links>All DETA>ISAS Upgrade
    Project (ISAS2)
    General enquiries and feedback to isas2@deta.qld.gov.au
    <mailto:isas2@deta.qld.gov.au>




    ________________________________

    From: Brian Kissell [mailto:Brian.Kissell@usq.edu.au]
    Sent: Friday, 2 October 2009 8:57 AM
    To: 'anz.heug@list.heug.org'
    Subject: [anz.heug] - Successful Go-Live at USQ



    Colleagues



    On Monday 28 September 2009 USQ successfully went live with Project S
    which encompassed the following upgrades and new implementations.



    PeopleSoft Student 7.6 to Campus Solutions V9.0

    PeopleSoft HR/Payroll 7.6 to HR/Global Payroll V9.0

    Oracle Portal

    Oracle Identity Management (effectively live since March 2009)

    Sitecore CMS (live since mid August)

    Gmail for Students

    New Modular Data Centre



    The upgrades and implementations were not without their challenges and
    there is still some minor mopping up in progress but all in all a major
    project delivered ontime and within budget which is a credit to all
    those involved. We could not have achieved this without the commitment
    of all staff, management and contractors involved and having adequate
    resources and skillsets available.



    In many respects we were once again let down by our suppliers on many
    fronts and we will cover off a number of the issues we encountered as
    future learning's at the November HEUG.



    Good luck to those still in the throws of PeopleSoft upgrades and
    implementations as we have heard a number are facing challenges of their
    own.



    Kind regards



    Brian Kissell

    Chief Technology Officer



    -----End Original Message-----


    --------------------------------------------------------------------------------
    This E-Mail is intended only for the addressee. Its use is limited to that
    intended by the author at the time and it is not to be distributed without the
    author's consent. Unless otherwise stated, the State of Queensland accepts no
    liability for the contents of this E-Mail except where subsequently confirmed in
    writing. The opinions expressed in this E-Mail are those of the author and do
    not necessarily represent the views of the State of Queensland. This E-Mail is
    confidential and may be subject to a claim of legal privilege.

    If you have received this E-Mail in error, please notify the author
    and delete this message immediately.
    --------------------------------------------------------------------------------
    !DEPTSTAMP1!
    Attend a Regional Conference Near You!


  • 10.  Successful Go-Live at USQ

    Posted 10-01-2009 09:54 PM
    Congratulations Brian and all of the team at USQ; a fine effort which
    clearly deserves a cold one (or two)...



    Regards

    Barbara



    Barbara Paterson



    Manager - HRMS Systems

    Human Resources

    University of Canterbury

    Room 532 | Registry

    Private Bag 4800

    Christchurch 8140

    New Zealand



    P: +64-3-364-2987 ext 8741

    F: +64-3-364-2325

    M: +64-21-2422954

    W: Barbara.paterson@canterbury.ac.nz

    W: www.canterbury.ac.nz http://www.canterbury.ac.nz



    The information contained in this message and or attachments is intended
    only for the person or entity to which it is addressed and may contain
    confidential and/or privileged material. Any review, retransmission,
    dissemination or other use of, or taking of any action in reliance upon,
    this information by persons or entities other than the intended
    recipient will constitute improper use of confidential material. If you
    received this in error, please contact the sender and delete the
    material from any system and destroy any copies.





    ________________________________

    From: Brian Kissell [mailto:Brian.Kissell@usq.edu.au]
    Sent: Friday, 2 October 2009 11:57 a.m.
    To: 'anz.heug@list.heug.org'
    Subject: [anz.heug] - Successful Go-Live at USQ



    Colleagues



    On Monday 28 September 2009 USQ successfully went live with Project S
    which encompassed the following upgrades and new implementations.



    PeopleSoft Student 7.6 to Campus Solutions V9.0

    PeopleSoft HR/Payroll 7.6 to HR/Global Payroll V9.0

    Oracle Portal

    Oracle Identity Management (effectively live since March 2009)

    Sitecore CMS (live since mid August)

    Gmail for Students

    New Modular Data Centre



    The upgrades and implementations were not without their challenges and
    there is still some minor mopping up in progress but all in all a major
    project delivered ontime and within budget which is a credit to all
    those involved. We could not have achieved this without the commitment
    of all staff, management and contractors involved and having adequate
    resources and skillsets available.



    In many respects we were once again let down by our suppliers on many
    fronts and we will cover off a number of the issues we encountered as
    future learning's at the November HEUG.



    Good luck to those still in the throws of PeopleSoft upgrades and
    implementations as we have heard a number are facing challenges of their
    own.



    Kind regards



    Brian Kissell

    Chief Technology Officer



    -----End Original Message-----


    This email may be confidential and subject to legal privilege, it may
    not reflect the views of the University of Canterbury, and it is not
    guaranteed to be virus free. If you are not an intended recipient,
    please notify the sender immediately and erase all copies of the message
    and any attachments.

    Please refer to http://www.canterbury.ac.nz/emaildisclaimer for more
    information.
    Attend a Regional Conference Near You!


  • 11.  Successful Go-Live at USQ

    Posted 10-01-2009 11:49 PM
    Congratulations to you and all your staff.

    Regards

    Barbara Buckley
    Program Manager
    Project Office
    Information Services
    Willett Centre (N53) 1.23D
    Nathan Campus
    Griffith University
    170 Kessels Road
    Nathan, QLD 4111
    Australia

    Phone: (07) 373 54424
    Fax: (07) 373 57845

    PRIVILEGED – PRIVATE AND CONFIDENTIAL
    This email and any files transmitted with it are intended solely for the
    use of the addressee(s) and may contain information which is confidential
    or privileged. If you receive this email and you are not the addressee(s)
    [or responsible for delivery of the email to the addressee(s)], please
    disregard the contents of the email, delete the email and notify the
    author immediately




    From:
    "Brian Kissell" <Brian.Kissell@usq.edu.au>
    To:
    "'anz.heug@list.heug.org'" <anz.heug@list.heug.org>
    Date:
    02/10/2009 09:00 AM
    Subject:
    [anz.heug] - Successful Go-Live at USQ



    Colleagues

    On Monday 28 September 2009 USQ successfully went live with Project S
    which encompassed the following upgrades and new implementations.

    PeopleSoft Student 7.6 to Campus Solutions V9.0
    PeopleSoft HR/Payroll 7.6 to HR/Global Payroll V9.0
    Oracle Portal
    Oracle Identity Management (effectively live since March 2009)
    Sitecore CMS (live since mid August)
    Gmail for Students
    New Modular Data Centre

    The upgrades and implementations were not without their challenges and
    there is still some minor mopping up in progress but all in all a major
    project delivered ontime and within budget which is a credit to all those
    involved. We could not have achieved this without the commitment of all
    staff, management and contractors involved and having adequate resources
    and skillsets available.

    In many respects we were once again let down by our suppliers on many
    fronts and we will cover off a number of the issues we encountered as
    future learning’s at the November HEUG.

    Good luck to those still in the throws of PeopleSoft upgrades and
    implementations as we have heard a number are facing challenges of their
    own.

    Kind regards

    Brian Kissell
    Chief Technology Officer

    This email (including any attached files) is confidential and is for the
    intended recipient(s) only. If you received this email by mistake, please,
    as a courtesy, tell the sender, then delete this email.

    The views and opinions are the originator's and do not necessarily reflect
    those of the University of Southern Queensland. Although all reasonable
    precautions were taken to ensure that this email contained no viruses at
    the time it was sent we accept no liability for any losses arising from
    its receipt.

    The University of Southern Queensland is a registered provider of
    education with the Australian Government (CRICOS Institution Code No's.
    QLD 00244B / NSW 02225M) -----End Original Message-----


    Attend a Regional Conference Near You!


  • 12.  Successful Go-Live at USQ

    Posted 10-04-2009 05:56 PM
    Thanx John

    Hope to see you in Hobart if you aree going to the CCAUDIT AGM, if not perhaps at the HEUG in November,

    Kind regards

    Brian


    On 2/10/09 9:16 AM, "Buckler, John" <john.buckler@lincoln.ac.nz> wrote:

    Congratulations – a real achievement..


    From: Brian Kissell [mailto:Brian.Kissell@usq.edu.au]
    Sent: Friday, 2 October 2009 11:57 a.m.
    To: anz.heug@list.heug.org
    Subject: [anz.heug] - Successful Go-Live at USQ

    Colleagues

    On Monday 28 September 2009 USQ successfully went live with Project S which encompassed the following upgrades and new implementations.

    PeopleSoft Student 7.6 to Campus Solutions V9.0
    PeopleSoft HR/Payroll 7.6 to HR/Global Payroll V9.0
    Oracle Portal
    Oracle Identity Management (effectively live since March 2009)
    Sitecore CMS (live since mid August)
    Gmail for Students
    New Modular Data Centre

    The upgrades and implementations were not without their challenges and there is still some minor mopping up in progress but all in all a major project delivered ontime and within budget which is a credit to all those involved. We could not have achieved this without the commitment of all staff, management and contractors involved and having adequate resources and skillsets available.

    In many respects we were once again let down by our suppliers on many fronts and we will cover off a number of the issues we encountered as future learning’s at the November HEUG.

    Good luck to those still in the throws of PeopleSoft upgrades and implementations as we have heard a number are facing challenges of their own.

    Kind regards

    Brian Kissell
    Chief Technology Officer


    -----End Original Message-----


    Kind regards

    Brian Kissell
    Chief Technology Officer

    Division of ICT Services
    University of Southern Queensland
    Toowoomba Qld 4350

    Phone: 07 4631 2426
    Fax: 07 4631 1493
    Email: kissell@usq.edu.au

    Visit the Division of ICT Services on the web at http://www.usq.edu.au/ict <http://www.usq.edu.au/ict>
    ----------------------------------------------------------------------------
    ---------------------------------


    This email (including any attached files) is confidential and is for the
    intended recipient(s) only. If you received this email by mistake,
    please, as a courtesy, tell the sender, then delete this email.

    The views and opinions are the originator's and do not necessarily
    reflect those of the University of Southern Queensland. Although all
    reasonable precautions were taken to ensure that this email contained no
    viruses at the time it was sent we accept no liability for any losses
    arising from its receipt.

    The University of Southern Queensland is a registered provider of
    education with the Australian Government (CRICOS Institution Code No's.
    QLD 00244B / NSW 02225M)

    Attend a Regional Conference Near You!


  • 13.  RE: Successful Go-Live at USQ

    Posted 12-02-2009 09:49 PM

    Brian,

    As part of your project did you interface PeopleSoft with SiteCore?   If so, would you mind sharing lessons learned.

     

    Cheryl

    cbthompson@unmc.edu